Interior Remodeling for Tumwater Homes
Tumwater kitchens built from the 1970s through the 1990s often have tight work zones and little counter space. We rework the layout so prep, cooking and cleanup stop bumping into each other.
Planning Tip: Decide early whether the sink, range and fridge stay where they are. Moving them means new plumbing, gas or electrical runs, which adds permits and time.
A typical Tumwater bathroom remodel needs a stronger fan, a new shower and storage that isn’t an afterthought. We build for daily wear and the damp months.
Planning Tip: Old one-piece showers rarely fit back through the door, so most bathroom remodels use tile or a multi-piece unit.
An addition or ADU adds living space without a move. We match the new rooms to your existing house so they look like they were always there.
Planning Tip: Start six to eight months before you want to break ground. Design, permits and material orders all take time.
Accessibility Remodeling That Supports Independence
A curbless shower, widened doorways and a few well-placed grab bars can keep a Tumwater rambler livable for years. We design these updates so they look like part of the house, not an add-on.
Planning Tip: Walk the route from your bed to the bathroom at night and note every step, rug edge and tight doorway. That route is usually the best place to start.
Universal design starts with what everyone touches: lever handles, rocker switches, outlets set a bit higher and even lighting. Our aging-in-place remodeling team, which includes a CAPS specialist, plans them for all ages.
Planning Tip: While walls are open for any remodel, have switches and outlets moved to easier heights. It’s a small job then and a messy one later.
Outdoor Living in Tumwater
Tumwater grew up along the Deschutes River, and plenty of yards here back onto trees and greenbelts. We build decks with flashed ledgers, drainage gaps and fasteners suited to wet weather so they last.
Planning Tip: On lots that back onto the river or a greenbelt, ask early whether buffer or critical-area rules apply. They can limit how close a deck can sit to the slope or the water.
Add a roof and some lighting, and a patio becomes a place to grill in March. We grade for drainage first, so water runs away from the house instead of toward it.
Planning Tip: Once permits are in hand, building a patio usually takes a matter of weeks.
Swapping old aluminum or single-pane windows makes rooms quieter and less drafty. Careful flashing keeps rain out of the wall.
Planning Tip: Late spring to early fall is the easiest window for installs, since the house is open to the weather.
Why Tumwater Homeowners Hire Dickey’s
Tell us what you’d like to change, at home or at work. Dickey’s is just up the road in Olympia, and we’ll meet you on site to go over scope, schedule and budget. We also take on commercial remodeling for Tumwater businesses.
We aim to reply within one business day, and we schedule consultations around your calendar.
A project manager leads a dedicated crew on your site. The crew reports to management daily, and our management team visits the job weekly to check the work against our standards.
We set up dust barriers, cover floors and use one access path through the house. Work areas are cleaned at the end of every day.
Yes. Tumwater was the first American settlement on Puget Sound, so some homes are old. We check for historic review before design.
Every change is written up with its cost and schedule impact, and work on it starts only after you approve.
Payments follow a progress schedule tied to project milestones, so you always know what’s due and when.